AABENRAA HOSPITAL

The construction/refurbishment at Aabenraa Hospital was divided into two phases. For Phase 1, we supplied fittings for patient rooms, including tall cabinets for storing the patient’s clothing, as well as pass-through cabinets that allow staff to restock utensils from the corridor without disturbing the patient in the room.

For the Central Sterile Services Department, special height-adjustable tables were developed, where the sit/stand function accommodates staff of varying heights. The tables are 4 m long and fitted with pre-rinse spray taps. The worktop material is stainless steel, which is suitable for a wet environment.

For several different departments, height-adjustable tables have been supplied as workstations for staff.

Acute Hospital, Phase 2

For Aabenraa Hospital Phase 2, we supplied both hospital and laboratory fittings. Hospital fittings included pass-through and patient cabinets, as well as hygiene stations. We fitted out both patient and staff kitchens; these differ, among other things, in the choice of colour for the doors, with patient kitchens featuring orange doors and staff kitchens beige.

For their medication room, we supplied height-adjustable tables with drawers underneath and shelves above. The height adjustment helps ensure ergonomically correct working postures for the user. All worktops were supplied in stainless steel and laminate.

We supplied a training kitchen where the entire kitchen can be raised and lowered at once, enabling patients with challenges to learn to manage in a kitchen again.

The delivery of laboratory fittings includes fume cupboards and LAF benches. Some of the fume cupboards are our pathology fume cupboards (Zafe 19), supplied with cut-out sinks, waste openings, and a cleaning shower. In the laboratories where tissue samples are handled, we installed a walk-in fume cupboard as an “extension” of the Zafe 19 fume cupboards, with a door in between. This streamlines the workflow, as the samples do not need to be moved from one fume cupboard to another, but are automatically transferred from the walk-in unit to the Zafe 19.

Gert Bach

Sales Manager, Zystm Care

gba@zystm.com

+45 4888 0112

Description

Supply and installation of hospital and laboratory inventory

Client

Region of Southern Denmark

Consultant

Aarhus Arkitekterne A/S, Cowi, Friis og Moltke, Ravn Arkitektur

Area, Phase 1

Zystm A/S

Number of fume cupboards, Phase 2

19 units