DTU 313

Building 313 at DTU Lyngby provides the setting for a highly advanced research infrastructure, where several research groups collaborate to address some of society’s major climate challenges.

In connection with the construction of the building, we have had the pleasure of contributing to the fit-out of several of the building’s research facilities on the Lyngby campus.

DANCE FLOOR LABORATORIES

The building is designed with a focus on flexibility and is prepared for the changes that research continuously demands. This is clearly reflected in the laboratory layout, which has been developed according to the “Dance floor” principle—a solution offering great freedom and flexibility, where the layout can quickly be changed and adapted to users’ needs.

The laboratories are also designed to support interdisciplinary collaboration and can be used by researchers from many different fields. To meet the need for flexible working environments, suspended service bridges have been installed and fixed to the building’s slabs, from which all technical installations are routed. Some of the bridges integrate overhead cabinets with glazed doors, while movable worktables with height-adjustable legs are positioned beneath the bridges, ensuring stable and flexible workstations.

As part of the project, we have also specially developed fume cupboards that meet the requirements of EN 14175 Part 7. These are specifically designed for handling aggressive processes, including boiling acids, and ensure a high level of safety and functionality in the laboratory environment.

Signe Liza Thorlaksen

Sales Manager, Zystm Lab Zealand

slt@zystm.com

+45 9215 2541

Description

Interdisciplinary research facilities for multiple research groups

Client

DTU Campus Lyngby