DTU Building 128/129

With Building 128/129, DTU has gained new laboratory facilities with associated workstations for research in Arctic technology and the Department of Geological and Geotechnical Research.

Laboratory island

We have installed a number of laboratory islands, built on base cabinets with a worktop above, as well as tall cabinets, walk-in fume cupboards, and Zafe 81 fume cupboards.

For Building 128, Research in Arctic Technology, we supplied a number of stainless-steel shelving units for use in their cold room. For Building 129, the Department of Geological and Geotechnical Research, we supplied pallet racking for their samples.

Staff lockers were supplied with white frosted doors.

Signe Liza Thorlaksen

Sales Manager, Zystm Lab Zealand

slt@zystm.com

+45 9215 2541

Description

Laboratory inventory and fume cupboards

Client

DTU Lyngby

Consultant

N. H. Hansen