DTU building 128/129

DTU have with building 128/129 gained new laboratory facilities with matching workspaces for both the Research in Arctic technology and the Department of Geological and Geotechnical Research.

We have installed many laboratory island benches constructed from cabinets with worktops in addition to supplying tall cabinets, walk in and Zafe 81 fume cupboards.

For building 128, Research in Arctic technology we have delivered stainless steel shelving for specific cold storage use. For building 129 Department of Geological and Geotechnical Research free standing racking for sample storage has been supplied.

Staff cabinets have white frosted doors.

 

FACTS

Description:  Laboratory equipment and fume cupboards
Builder:         DTU Lyngby
Consultant:   N.H. Hansen